Feininger PET foam core production line is a special equipment that combines reactive extrusion and foaming processes. It is one of the best PET extrusion lines in China.
Because of our special extruders, the quality of our PET foam core machine has high performance, low energy consumption, durability and versatility. Therefore, our machine has been widely used in more than ten countries and regions in the world.
Specification
Model |
Raw Materials |
Additives |
Foam Agent |
Output |
Density |
PET Foam Board Width |
PET Foam Board Thickness |
FS95T/250C |
PET (Bottle grade polyester chips) |
chain extender, nucleating agent,
... |
CO2, Cyclopentane
|
400kg/hr
- 650kg/hr
|
60kg/m3 -
120kg/m3
|
1000-1250mm
|
5-60mm |
Our Advantages
(1. The supercritical carbon dioxide composite foaming system can also realize a completely incombustible foaming agent system, which greatly improves the process safety, significantly reduces the cell size, improves the cell uniformity, and finally improves the comprehensive mechanical properties of the PET foam material.
(2. Energy saving and environmental protection are also a highlight of this equipment. This set of equipment can not only use conventional flake-grade PET resin as the foaming matrix resin, but also use recycled PET flakes as the main resin, and the corner waste can also be completely recycled, so it is energy-saving, efficient, safe, environment friendly, and cost-effective to realize the stable and continuous extrusion production of PET foam extruded boards and sheets with high foaming ratio.
Composition
1 |
Automatic Loading system with 5 feeding units |
2 |
Primary Extruder:(twin screws) |
3 |
Blowing Agent Injection System |
4 |
Hydraulic Screen Exchanger with Hydraulic pressure station |
5 |
Secondary Extruder:(single screw) |
6 |
Static Mixer |
7 |
DIE UNITS |
8 |
Haul-off Unit |
9 |
Cooling Racks |
10 |
Second haul-off |
11 |
Online planing machine(optional) |
12 |
Widthwise Cross Cutting System |
13 |
Driving Rollers |
14 |
Revolving Cooling Unit |
15 |
CENTRAL CONTROL STATION |
Factory Requirements
1, Power Supply: 800KVA, 3 phases, 380V, 50HZ
2, Normal running power: 300KW-400KW
3, Compressed Gas: 7bar, >=6m3/min
4, Cooling Water: 4bar, 80m3/hr,15ºC (recommend to use industrial chiller)
5, Floor space:Min. L*W*H, 120M*25M*10M (this is the basic requirement)
6, Foundation: firm base ≥15cm reinforced cement (recommended)
After receiving the down payment, Feininger will provide the loads and forces for the foundation requirement for the extruders, revolving cooling unit and central dust collection system.
7, Labor required: 1-3 skilled workers /shift (3 shifts/day recommended )
8, Ambient condition: Forced draught, vented, laminated , ambient temperature should be above 0 ºC, Bottom of workshop need ventilation, Ventilation Device must be installed on the Die port and Screen Changer by Customer.
9, Fire-fighting Grade: Plant design should reach safety requirements for that of Electronic products, Fire Extinguishing is requested around the production line. Check the details refer to the annex file.
Packing and Loading
Application of PET Foam Core

Company Profile
Feininger takes "Basing On Talents, Leading the Technology" as its policy and focus on faithful business, which has enabled us to grow rapidly in Feininger takes "Basing On Talents, Leading the Technology" as its policy and focus on faithful business, which has enabled us to grow rapidly inface of the fierce competitions. Our products were sold to Australia, America, Middle east Asia, Europe and wins good customer feedback.
With the continuous improvement of performance level, Feininger's experience and continuous research on technology and solutions, plastic material extruders improve the productivity of the production line, reducing costs and energy consumption.
Feininger successfully won certificates of ISO9001:2008, ISO14001:2004 and CE, which ensures stable quality control. In addition, we accentuate humanization design with goal to offer quality and humanized products. Strict quality control is our promise to customers. Before products are delivered, each lot is inspected severely.